The Project Development and Delivery Model (PDDM) project set out to develop and implement a Phase-Gate model approach to capital infrastructure project management for the Integrated [...]
The NL1 Pump Station Value-based Design Review involved investigation of various options for replacement of the NL1 pump station. The NL1 pump station was initially installed as a temporary [...]
The existing Arlington Bridge is situated over a Canadian Pacific (CP) railway yard in Winnipeg, Manitoba. The century-old bridge was nearing the end of its useable service life and required a [...]
The Mill Creek Pedestrian Bridges project was initiated to replace or rehabilitate five aging pedestrian bridges that link several kilometers of nature trails located in the area.
During construction of Edmonton’s new Metro Line LRT, a need arose for a storm tunnel to be constructed at the MacEwan station portal, where the train would return to street level. This tunnel [...]
Edmonton’s Clover Bar Lagoons currently hold enough solids to cover 300 CFL football fields one metre deep and about, every two months, they receive enough to cover another 10. The lagoons are at [...]