The NL1 Pump Station Value-based Design Review involved investigation of various options for replacement of the NL1 pump station. The NL1 pump station was initially installed as a temporary [...]
The Mill Creek Pedestrian Bridges project was initiated to replace or rehabilitate five aging pedestrian bridges that link several kilometers of nature trails located in the area.
The existing Arlington Bridge is situated over a Canadian Pacific (CP) railway yard in Winnipeg, Manitoba. The century-old bridge was nearing the end of its useable service life and required a [...]
SMA Consulting assisted the City of Edmonton’s Drainage department on the W13 project by providing innovative decision support, including risk analysis and value engineering workshops, [...]
SMA Consulting assisted the City of Edmonton’s Drainage department on the W13 project by providing innovative decision support, including risk analysis and value engineering workshops, [...]
During construction of Edmonton’s new Metro Line LRT, a need arose for a storm tunnel to be constructed at the MacEwan station portal, where the train would return to street level. This tunnel [...]
Edmonton’s Clover Bar Lagoons currently hold enough solids to cover 300 CFL football fields one metre deep and about, every two months, they receive enough to cover another 10. The lagoons are at [...]
The City of Edmonton aimed to expand through city infill and densification, rather than through potentially costly urban sprawl. An area of undeveloped land, adjacent to the CP Rail line and yard [...]
At SMA we developed a software that would meet the City's needs, creating a system that encourages sustainable infrastructure management as well as reducing time spent by City employees in [...]
Edmonton’s Walterdale Bridge, which had faithfully served pedestrians since 1914, was in sore need of an upgrade. City officials decided that the bridge had reached the end of its service life, [...]